Remak DoorMaster D2 Instrucciones de operaciones Pagina 17

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 28
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 16
17
Air curtains
Figure 25 – C1-E2/TR air curtains connection
X1 - Main power connection (supply)
L1+L2+L3+N+PE - Input voltage terminals
TK-TK - under-voltage circuit breaker connection terminals
DK1-DK2 - Door contact connection terminals
Fan controller connection terminals:
Q1 - 1. Speed stage
Q2 - 2. Speed stage
Q3 - 3. Speed stage (the highest speed) or two-pole
switch/breaker connection terminals
Electric heater controller power supply terminals:
Q1E - I. Electric heater section
Q2E - II. Electric heater section
Q3E - I.+II. Electric heater section,
or room thermostat (single-stage, terminals LE+Q3E)
XS - Terminals for air curtain chaining
(assembly according to t the type),
refer to the "Air Curtain Chaining" section page 21)
Figure 24 – C1-E2 air curtains connection
Wiring diagrams
X1 - Main power connection (supply)
L1+L2+L3+N+PE - Input voltage terminals
TK-TK - under-voltage circuit breaker connection terminals
DK1-DK2 - Door contact connection terminals
LV+Q3 - Two-pole switch/breaker connection terminals
Electric heater controller power supply terminals:
Q1E - I. Electric heater section
Q2E - II. Electric heater section
Q3E - I.+II. Electric heater section,
or room thermostat (single-stage, terminals LE+Q3E)
XS - Terminals for air curtain chaining
(assembly according to the type),
refer to the "Air Curtain Chaining" section page 21)
Vista de pagina 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 27 28

Comentarios a estos manuales

Sin comentarios